Sunday, November 8, 2009

How Do I Finalize A Movie With Sv2000 Remote?

Mamiano will soon have a playground


Sunday, October 18 was an important day for Mamiano. From a
part of the recovery of the catechism after the summer break, the other the submission of the draft of the new playground. The day's program
the meeting at 10.45 with the presentation to the class of catechists for 2009/2010. At 11.30 the Mass celebrated under the porch of the rectory, at 12.30 lunch buffet in the sports field behind the church. In the afternoon, were held games and entertainment for children from 14 to 17. After Mass, the architect
Sauro Rossi presented to children, families and all those present the project "The House of the children and families" including the church, rectory, and all the surrounding green area, owned by the Parish , which will be equipped playground in early 2011.
The new park will be built next to the church, the area now occupied by the marquee in which to date have been organized several dinners and initiatives of the "Mamiano Together". "In mid-September - Don announces Avanzini - I gave notice to the" Mamiano Together "of floor space on a loan of embankments on the corner of Via Colli, because I believe that young people have a fundamental place in the parish." The result of the work to be concluded in 2011, occurred when they were defined as large renovation of the parish church of San Biagio, uninhabitable by the earthquake of December 23 last year, and of their parsonage, also to be completed between 2010 and 2011. "It should be noted - still don Avanzini - that the park project has been thought by the children of the parish, who, during the summer, participated in the planning area split into working groups organized by age groups. Everyone was able to contribute with their imagination and their desires to design the park to be built alongside the Church. " "Many believers and many families in recent months - he concludes Don Andrea - have expressed a desire to return to their Church reopened after restoration and surrounded by spaces dignified, decent, friendly and always accessible to everyone, including children, young people and families. To all of them I do know that the preliminary draft for the restoration of damaged structures had no objection in August, so it is almost certain that it will be finally approved in November and since that day there will be 12 months to finish the work. " "At Christmas 2010 - said the priest - probably will come back to celebrate Mass in our church."

0 comments:

Post a Comment